.. _field_site: AWAKEN Field Site and Wind Farms =================================== ARM SGP ------- The AWAKEN field campaign is taking place in northern Oklahoma, in proximity to the `DOE Atmospheric Radiation Measurement (ARM) Program's Southern Great Plains (SGP) facility `_. The SGP covers 55,000 acres and includes more than 30 instrument clusters. Wind Plants ----------- Five wind plants south of the central SGP facility comprise the AWAKEN field campaign area. Details about each plant are located in the table below. +-----------------+-------------------------+--------------------+--------------------------------------------+--------------------------+ | Wind plant | Year of first operation | Number of turbines | Turbine model (rotor diameter, hub height) | Net capacity factor [#]_ | +=================+=========================+====================+============================================+==========================+ | Chisholm View | 2012 | 167 | | 140 x GE 1.68 MW (82.5 m, 80 m) | 0.35 | | | | | | 27 x GE 2.4 MW (107 m, 80 m) | | +-----------------+-------------------------+--------------------+--------------------------------------------+--------------------------+ | Thunder Ranch | 2017 | 120 | | 109 x GE 2.5 MW (116 m, 90 m) | 0.41 | | | | | | 11 x GE 2.3 MW (116 m, 90 m) | | +-----------------+-------------------------+--------------------+--------------------------------------------+--------------------------+ | Breckinridge | 2015 | 57 | GE 1.7 MW (103 m, 80 m) | 0.49 | +-----------------+-------------------------+--------------------+--------------------------------------------+--------------------------+ | Armadillo Flats | 2018 | 126 | | 59 x GE 1.79 MW (100 m, 80 m) | 0.43 | | | | | | 21 x GE 1.715 MW (103 m, 80 m) | | | | | | | 46 x GE 2.3 MW (116 m, 90 m) | | +-----------------+-------------------------+--------------------+--------------------------------------------+--------------------------+ | King Plains | 2020 | 88 | GE 2.82 MW (127 m, 89 m) | 0.37 | +-----------------+-------------------------+--------------------+--------------------------------------------+--------------------------+ More details (lat, lon, hub height, rotor diameter) about the turbines of Armadillo Flats and King Plains are available `here `_. .. [#] Net capacity factors are calculated as an average from the annual net generation values reported by the U.S. EIA. (“Electricity plan level data for oklahoma,” https://www.eia.gov/opendata/v1/qb.php?category=902967, Last accessed on 2022-12-30.) Data for the first year reported by the EIA are not considered in the calculation.